top of page

Our Works

PHOTO-2022-01-28-13-15-36_edited.jpg
21_edited.jpg

01

1200mm Water Pipeline Relocation at Kinarut

PCSB was engaged to conduct a final step of relocating a 1200mm MSCL raw water pipeline due to road expansion work. This project required both hot tapping and inline stopping services to be conducted. (Video)

02

300mm DI Hottaping

300mm DI was a main pipeline that served part of KK city. Under no water shutdown requirement by water authority, developer engaged PCSB to conduct hot taping service and construct bulk meter stand. (Video)

WhatsApp Image 2021-07-28 at 1.31_edited
WhatsApp Image 2021-07-28 at 5.38.53 PM (1).jpeg
WhatsApp Image 2021-07-28 at 1.55_edited
image_edited.jpg
PHOTO-2023-01-07-12-24-20.jpg
IMG_20200215_091803 (Medium)_edited_edit

03

EUROMAG Flowmeters Deployment for Priority Customers

More than 70 Euromag 50-150mm electromagnetic flowmeters were deployed in Kota Kinabalu to monitor water consumption of priority consumers. These flowmeters integrate to our home-grown TheCode IIoT solution to give our client direct support to their customers.

04

600mm Water Pipeline Relocation at Lahad Datu 

PCSB was engaged to assist a PAN Borneo project to commission a new 600mm pipeline without the need to shutdown water supply to consumers. Hot Tapping and Inline Stopping services were conducted to successfully relocate the pipeline. Side photos show the equipments for inline stopping, completion to seal off inline plug's entry point and the end results of this exercise.  

WhatsApp Image 2023-08-28 at 11.24_edite
WhatsApp Image 2023-08-29 at 08.50_edite
WhatsApp Image 2023-08-29 at 14.24_edite
WhatsApp Image 2023-08-29 at 12.11_edite
bottom of page